April 2024 — October 2024
7 months
“KKS-SICIM” LLP Karachaganak Expansion Project 1, 1st construction phase (KEP1A)
Aksay (Kazakhstan)
E&I QA/QC Inspector
- Inspection of the E&I and HVAC & Telecom activities;
- Follow up “ Inspection and Test Plan “ (ITP);
- Insure that there is a strong health and safety culture when executing works;
- Inspection of the work force for to have the correct competency and certificates;
- Incoming Inspection of the material dept to ensure that materials have all needed documentation before
start of work;
- Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing
are in compliance with the technical requirement according to the project specification;
- Inspection of cable installation including cable trays, cable glands, termination, insulation resistance,
continuity testing etc;
- Witnessing all tests including verification and calibration of instruments and safety devices;
- Inspection of Fiber optic cable installation;
- Also performed Instrument Calibrations, Pressure Leak Testing, Loop Checking;
- Inspection and Installation for pressure testing of impulse lines and manifolds;
- Inspection at substations in the high and low voltage side, power transformer, Switchgears & UPS Panel,
Small power circuit, Lightning protection and Earthing system;
- Red Line Mark Up on drawings for E&I and Telecom Disciplines;
- Controlling contractor procedures, inspection and test plans and other technical and quality documents,
to ensure effective controls;
- Closing check list and punch list;
- Take actions whenever there are persons violating rules and procedures;
- Give input to develop the site: Equipment, personnel, organization;
- Equipment’s installation and inspection in Hazardous area (EX INSPECTION).
September 2023 — December 2023
4 months
Isker Consortium LLP NWTF Project (West Eskene)
Atyrau
Completion and Handover Engineer
- Coordination and tracking closure of ITRs and Punches for further successfully completing of Subsystems;
- Uploading / Closing checklists and Punch List Items into the SPITCH System. Good knowledge of working SPITCH Software;
- Arranging and Participation of the MCWD (Mechanical Completion Walkdown) for the checking and ensuring that all activities are completed at the site as per the ITRs for the further closing subsystem. Performed all duties required to coordinate mechanical completion walk downs and coordinated and planned for mechanical completion walk down;
- Colloborate with Construction and QA/QC departments for deciding any issues for closing ITRs and Punch Items;
- Prepare Loop Folders, Work Packages, and Completion Dossiers (electronic unless required hardcopy by regulatory) to support the approval/acceptance of Systems or SubSystem Groups according to the Turnover / Handover Philosophy;
- Preparation of DCRF (Data Change Request Form) for the deletion of Tags and ITRs from the Spitch System according to RLM drawings;
- Confirmed Punch list items and ITR and MC/PC Certificate status were continuously updated and sent as Daily Reports;
- Preparation of system handover certification dossier and associated documentation with attention to detail;
- Performed all duties required to get all certificates signed by the Client.
May 2023 — September 2023
5 months
Isker Consortium LLP NWTF Project (West Eskene)
Atyrau, isker-group.com/
E&I/T QA/QC Inspector
- Inspection of installation all Electrical, Instrument and Telecom works according to project specification, standards, procedure, GOST’s and PUE.
- Daily surveillance of construction works and issuing IR’s, NCR’s and Daily reports.
- Inspection for closure of ITR’s and Punch lists
- Participation on Mechanical Completion Walkdowns
- Planning and coordinate involvement in Mechanical Completion activities
- Leadership on all matters relating to Mechanical completion.
- Assist projects in planning and development of Systems Completion Plans
- Providing daily, weekly as well as monthly reports as required by the project.
- Punch list monitoring and priority compliance up to Handover.
- Construction and Commissioning punch list clearance to meet project milestones.
- Monitoring that punch lists items are accurate and properly filed and properly categorized(A,B,C)
- Material receiving inspections for all Electrical, Instrument and Telecom equipment according to project specification, standards, data sheets, GOST’s and PUE.
- General HSE follow-up and monitoring
December 2020 — April 2023
2 years 5 months
Isker Consortium LLP OV Project(Tengiz)
E&I QA/QC Inspector
OV Electrical and Instrumental Installation works MEI Project
- Carrying out electrical and control measurement works:
lighting, power, thermal tracking, fire and gas etc. starting
with detailed review of documents installation, mechanical
completion commissioning;
- Performance of electrical, instrument, fiber optic and
measurement work;
- Delivery of the object in accordance with all requirements
and standards, including the delivery of all documents (check
list, punch list, ITP);
- Conduct surveillance and witness testing associated with
equipment and system in accordance with Inspection Test Plan ITP;
- Raising for completed jobs Notification For Inspection NFI (Witness, Hold Point, Surveillance, Review, Type of ITP and Section, type of QVD as per ITP section, Contractor/Subcontractor name if available, inspection date)
- Monitoring of electrical ant instrumentation installation,
above and below ground, equipment installation, cable tray,
cable pulling, laying, dressing, tagging, segregation, section
cross, glanding, termination and final testing;
- Issue Non-Conformance Report NCR and Surveillance Report SR for violation of specifications, installation details or design
and layout;
- Making inspection as per ITP, and checking as per Quality Verification Document QVD, Barcoded or NonBarcoded QVD as per type of inspection (partially or full) and System/Subsystem number.
- Witness and verify all testing during inspection and preinspection: continuity, insulation resistance IR (in cable trench
after pulling and after backfilling), ductor test for e-rod and
earthing cables, attenuation for FO cables, Outer and
Separation sheath tests and VLF (HI-POT) for HV cables;
- Review procedures for testing/examining components with
optimal ways and technical methods.
November 2019 — December 2020
1 year 2 months
Isker Consortium LLP OV Project (Tengiz)
Atyrau, isker-group.com/
E&I QA/QC Technical Clerk
- Responsible with the tracking verification of the QAQC Documents;
- Collect the quality documents from the QC Inspectors;
- Verify and ensure that inspectors are using the last updated version of QVD’s received from the Client
- Control if the drawings attached to the NFI’s are in approved for construction code;
- In case of deviations from the design, attach to the documentation the Red line Mark Up and sketches provided by the Engineering Team;
- Communicate effectively with supervision and employees;
- Assist when necessary to prepare and organize QA duties;
- Assist the quality department with overflow documentation work;
- Schedule meetings, record minutes when required;
- Ensure security, integrity and confidentiality of the Quality Department;
-Performs other administration related duties as assigned for the purpose of ensuring the efficient and effective functioning of the department.
May 2019 — September 2019
5 months
Tesla Tan 3GP Project (Tengiz)
Atyrau, teslatan.kz
E&I technician
– Pulling, laying and cable termination for various systems (electrical cable, instrumentation cable);
– In the process of manufacturing marking out very difficult electrical units according to drawings;
– Preparing of highly complicated face and assembly templates. Manufacturing and assembling of low voltage and high voltage complete dispatch devices, assembling them into blocks;
– Regulation of electrical equipment;
– Assembling of control cabinets, switchboards, control station into blocks;
– Installation and termination of E&I Ex proof equipment, Luminaries, Junction boxes, Marshaling panels;
– Installation and termination of instrument equipment such as PT, TT, LT, PDT;
– Installation and termination of Fire and Gas, PAGA, TELECOM system equipment.
Skills
Skill proficiency levels
About me
Able to demonstrate and be role models and feel comfortable in close collaboration with peers and senior management in the organization.
I adhere to the values: honesty, partnership and trust, as well as creating an environment free of incidents and injuries.
is able to identify and build key relationships that contribute to the achievement of high-quality results.
I have experience working and leading a multinational team.
Highly motivated person able to work
independently and participate in a highly effective team.
Excellent communication and presentation skills in Russian and English.
Ability to read, interpret and communicate (both in writing and orally) in English.
Seeks to expand as an Engineer by using proven managements, construction and E&I skills, also always ready to learn and study new knowledge for my growth being a demand expert.
Higher education (master)
2019
National Research Tomsk Polytechnic University
Lighting technology engineer, Lighting technology engineer
2017
Electrical Engineer, Electrical Engineer
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter